Zimbabwe Imports from Sweden of Articles of iron or steel |
Value |
Year |
Articles of iron or steel, not specified elsewhere
|
$72.16K
|
2023
|
Screws, Bolts, Nuts, Coach Screws, Screw Hocks, Rivets, of Iron or Steel
|
$36.26K
|
2023
|
Springs and Leaves for Springs, of Iron or Steel
|
$4.14K
|
2023
|
Tube or pipe fittings, of iron or steel
|
$2.04K
|
2023
|
Cloth, grill iron or steel, expand metal, iron or steel
|
$5.21K
|
2022
|
Chain and parts, of iron or steel
|
$0
|
2022
|
Tubes, Pipes and Hollow Profiles, Seamless, of Iron or Steel
|
$2.10K
|
2021
|
Stranded Wire, Ropes, Cables, Plaited Bands, Slings, of Iron or Steel
|
$22.82K
|
2020
|
Tanks, over 300 liter capacity, iron or steel
|
$20.37K
|
2020
|
Containers for compressed or liquified gas
|
$7.56K
|
2020
|
Other Tubes, Pipes and Hollow Profiles (Open Seam or Welded, Riveted)
|
$4.03K
|
2020
|
Structures and Parts of Structures, of Iron or Steel
|
$23.54K
|
2018
|
Tanks, not over 300 liter capacity, iron or steel
|
$1.52K
|
2018
|
Table, Kitchen or Other Household Articles, of Iron or Steel
|
$132
|
2018
|
Sewing Needles, Knitting Needles, for Use in the Hand, of Iron or Steel
|
$44
|
2018
|
Railway or Tramway Track Construction Material of Iron or Steel
|
$335
|
2017
|
Tubes, pipes and hollow profiles of cast iron
|
$6.92K
|
2015
|
Other Tubes and Pipes (Welded, Riveted), of Iron or Steel
|
$795
|
2015
|
Radiators, Air Heaters, Hot Air Distributors, not electrically heated
|
$462
|
2015
|
Anchors, grapnels and parts of iron/steel
|
$49
|
2012
|